Outcomes (sample figures)
98.6%
on-time in full
11 h
dock-to-store
6
new routes
The challenge
A chilled cross-dock with six insulated doors, built to serve regional grocery routes overnight. This case study is sample content; replace it with a real project you have permission to publish.
What we did
Summarise the scope, the constraints you worked within and how the work was phased. Use numbers you can stand behind.
Result
Describe the measurable outcome and what the customer can now do that they could not before.
Project data
Scope
Fit-out and fleet
Temperature
+2 to +8 °C
Doors
6 insulated
Planning something similar?
PRJ
More
More projects.

PRJ-01
Automotive & Mobility
Line A capacity expansion
A second conveyor line and robotic weld cell lifted output for a tier-1 bracket programme without extending the building.

PRJ-02
Food & Beverage
Cold-chain distribution hub
A chilled cross-dock with six insulated doors, built to serve regional grocery routes overnight.

PRJ-03
Industrial Machinery
Press shop retrofit
Rebuilt a 400-tonne hydraulic press with new guarding, controls and quick-change tooling.